Renovations · Extensions · Period homes

Renovations and extensions

A renovation is the best chance you’ll get to fix how your home works. We plan the new layout and every interior detail, then work alongside your builder.

Renovated rear extension with a skylit kitchen and living area

Plan it before you build it

Get the layout right first

We plan the new layout and the interior details, then work alongside your builder, and your architect or draftsperson if you have one, so the finished rooms match the plan.

Working out the layout before you commit to building work is where good design saves the most money.

Before you renovate

Five things to check early

A little homework before the design is final saves expensive surprises once the builder starts.

  • Check the planning overlays on your address with a free VicPlan property report
  • Heritage Overlay areas often need a planning permit for changes to the outside
  • Structural work usually needs a building permit
  • Homes built before 1990 may contain asbestos: have it tested before demolition or drilling
  • A builder or engineer confirms whether walls are load-bearing before you remove them

General guidance only. Your builder, building surveyor, landlord or council confirms what applies to your project.

Period home living room with a fireplace and bay window
Renovated rear extension with a skylit kitchen and living area

What’s included

Where we help most

  • Layout before buildingThe best layout worked out before you commit to building work.
  • Opening upClosed-off kitchens and living areas turned into spaces that flow.
  • Light and spaceDark, narrow homes such as period cottages made brighter.
  • Extensions that belongNew rooms that feel part of the original house.
  • Every finish chosenFinishes, fixtures and fittings in one schedule.
  • Working with your teamYour builder, architect or draftsperson, all working from one plan.

The process

How a renovation comes together

  1. 1

    Site visit and brief

    Not sure what’s worth changing?

    We walk through the house with you, look at what works and what doesn’t, and talk about budget, timing and any permits you might need.

    You receive: A summary of your brief and a proposal for the design work.

  2. 2

    Layout options

    Not sure which walls should go?

    We test a few layouts on paper, from opening up the kitchen to adding a rear living area, so you can compare them before anything is built.

    You receive: Layout options and a concept board for the new spaces.

  3. 3

    Drawings and selections

    Worried the builders’ quotes won’t match?

    We draw the interior details and schedule every finish, fixture and fitting, so every builder quotes on the same thing.

    You receive: Interior drawings and a selections schedule your builder can price.

  4. 4

    Building support

    Worried about decisions made on the run?

    While the builder works, we answer questions and check details on site, so the finished rooms match the plan.

    You receive: Support during the build and finished rooms that match the plan.

Book a consultation More about our process

Who it suits

Renovations we help with

Period homes

Victorian and Edwardian homes that need modern living areas.

Closed-off layouts

Kitchens and living rooms that feel cut off from each other.

Growing families

More bedrooms, more storage, or space to work from home.

Planning an extension

A new rear living area that ties back into the house.

Questions about renovations and extensions

Do I need a planning permit to renovate?

Many internal renovations don't need a planning permit, but some do, especially in a Heritage Overlay or when you change the outside of the house. Structural work usually needs a building permit. You can check the overlays on any Victorian address with a free VicPlan property report, and your builder or building surveyor will confirm what's needed.

What should I know about renovating an older home?

Homes built before 1990 may contain asbestos. Have suspect materials tested by a licensed professional before any demolition or drilling. If you're removing walls, a builder or engineer needs to confirm whether they're load-bearing before the design is final.

How long does a renovation take?

Design usually takes a few weeks to a few months, depending on the size of the job and how quickly decisions are made. Building time depends on the scope, approvals and your builder's schedule. After the first consultation we'll give you a realistic timeline for the design stages.

See all questions

Let’s talk about your renovation

Send a few details, or reach us directly. We’ll reply with next steps.