Planning a kitchen renovation in Melbourne: what to decide first

Layout, appliances, storage, then finishes. The order of decisions that keeps a kitchen renovation on track.

Kitchen with navy cabinetry and a marble island

Kitchen renovations go wrong most often because decisions are made in the wrong order. Someone falls in love with a tile, then finds the layout does not work, or chooses cabinet colours before knowing where the appliances will go. Here is the order we suggest for a kitchen renovation in Melbourne.

1. Start with how you cook and live

Do you cook every night or mostly reheat? Does more than one person cook at once? Do the kids do homework at the bench? These answers decide how much bench space you need, where the bin and dishwasher go, and whether an island makes sense.

2. Fix the layout

Layout comes before everything else. Think about the path between the fridge, sink and cooktop, how wide walkways need to be, and where people will gather without getting in the cook’s way. Moving plumbing, gas or a wall changes the cost a lot, so it is worth deciding early whether those things will move.

3. Choose appliances next

Appliance sizes set the joinery measurements. Choose the fridge, oven, cooktop, rangehood and dishwasher before the cabinets are drawn, and check the exact specifications. An integrated fridge, for example, needs different cabinetry from a freestanding one.

4. Plan storage in detail

Good kitchens are planned drawer by drawer. List what you need to store: pots, trays, spices, small appliances, recycling. Deep drawers are usually easier to use than low cupboards. A pantry, even a narrow one, takes pressure off the rest of the kitchen.

5. Then choose finishes

Now pick the benchtop, cabinet finish, splashback, handles and tapware. Look at samples together in the room’s light, because colours change between morning and evening. When comparing benchtops, note that engineered stone has been banned in Australia since 1 July 2024, so options today include natural stone, porcelain, compact surfaces, laminate and timber.

6. Lighting and power last, but not least

Plan task lighting over the bench, softer lighting for evenings, and enough power points in the right places. In Victoria, electrical and plumbing work must be done by licensed tradespeople, so your designer’s drawings should be clear enough for them to quote from.

Allow time for joinery

Custom cabinetry is made to measure and can take several weeks to make, so confirm lead times before booking demolition. A kitchen that is fully drawn and specified before work starts is much easier to price and much less likely to blow out.

See our kitchen and bathroom design service, or book a consultation to talk about your kitchen.

Talk to us about your project

Send a few details, or reach us directly. We’ll reply with next steps.

Chat with us
Call WhatsApp Book